Are the existing fences along Kenton Road going to be replaced?
Yes, the existing fences that are impacted during construction will be replaced in-kind. All the fences and trees were removed during Phase 1 of construction to allow the contractor access to build the proposed improvements. During this time, temporary chain link fences were installed. Once the improvements are complete in each phase of construction, the impacted fences in that area will be replaced with permanent fences.
Will the driveways and entrances along Kenton Road be closed during construction?
No, all driveways and entrances along Kenton Road within the construction area will remain open during construction.
Will there be detours during construction?
Yes, there are 4 phases of construction that will require roadway closures that require detours. The construction schedule was analyzed to determine the appropriate length of time needed for the roadway closures. If the contractor exceeds the amount of time allowed for each closure, there is a daily fine associated with this. See the timeline posted on the website for durations.
Will school bus routes be impacted?
Yes, all the schools in the area were informed of the construction and the roadway closures. DelDOT will work with the school districts to ensure they are notified at each phase of construction.